22.11.2010 . The company Sokol Ltd. Vinkovci started building work on the project and the construction of the building substation plat and supporting connecting surface and groundwater . Construction work on include all excavation and construction work on the construction of the building installations of 220 kV , 110 kV and 35 kV and building controls in the ceiling substation possession as well as their interior design and furnishing . Also the project includes excavation and construction work on the construction of overhead transmission lines with nominal voltages of 220 kV , 110 kV and 35 kV , which include making the transition paths in extremely steep terrain category A , as well as excavation and reinforced concrete works on the construction of the foundation pillars of the lines mentioned.