The lateral canal is about 12.3 kilometers long. The function of the canal is two-purpose irrigation of agricultural areas in dry periods, by releasing water from the Dragon Danube into the lateral canal, ie draining into the Danube of excess torrent water coming into the lateral canal from the Baranja mountain.

The construction works include all earthworks and construction works on the construction of the 220 kV, 110 kV and 35 kV plant buildings and the command building in the ceiling of the plat substation, as well as their internal arrangement and equipment.

The coking plant in Bakar was opened in 1976 and until 1995, the plant was used for the production of coke, and had a 250 m high chimney that was used to emit harmful gases. The space of the coking plant in Bakar is recognized by the Ministry of Environmental Protection, Physical Planning and Construction as one of the 10 black spots in the territory of the Republic of Croatia.

Poduzeće za komunalno gospodarstvo u pretežitom vlasništvu Grada Osijeka ima osnovnu zadaću brinuti se o čistoći, urednosti i ljepoti gradskih ulica, parkova i drugih javnih i zelenih površina.

Metronet's communication solutions are primarily intended for business users who need a wide variety of voice, data and video services.

Hrvatska elektroprivreda (HEP Group) is a national electricity company, which has been engaged in the production, transmission and distribution of electricity for more than a century.