{"id":535,"date":"2025-05-01T10:02:02","date_gmt":"2025-05-01T10:02:02","guid":{"rendered":"http:\/\/sokol.local\/?post_type=projekti&#038;p=535"},"modified":"2025-05-02T19:39:41","modified_gmt":"2025-05-02T19:39:41","slug":"kogeneracijsko-postrojenje-viridas-biomas","status":"publish","type":"projekti","link":"https:\/\/sokol-vinkovci.hr\/en\/projekti\/kogeneracijsko-postrojenje-viridas-biomas\/","title":{"rendered":"Cogeneration plant &quot;VIRIDAS BIOMAS&quot;"},"content":{"rendered":"<p>The Te\u010dina business zone is located directly next to the Zagreb\u2013Lipovac Highway, next to the Babina Greda settlement, which is located on the northeastern side of the zone.<\/p>\r\n\r\n\r\n\r\n<p>The Te\u010dina business zone has an area of 174,000m2, consists of one plot and a cogeneration plant and suitable heat consumption facilities are being built on it for the purpose of utilizing thermal energy.<\/p>\r\n\r\n\r\n\r\n<p>The cogeneration plant and facilities are;<\/p>\r\n\r\n\r\n\r\n<p>BIOMASS POWER PLANT<br \/>BIOMASS STORAGE<br \/>COLD STORAGE REFRIGERATOR<br \/>GREENHOUSE<br \/>ENTRANCE TO POWER PLANT ENTRANCE<br \/>GREENHOUSE ENTRANCE<br \/>The works began in mid-November 2014, while the planned completion date, or duration of the works, is 19 months.<\/p>\r\n\r\n\r\n\r\n<p>During the execution of works according to the dynamics, the expected number of employees performing works on the construction of the plant reaches up to 150 employees.<\/p>\r\n\r\n\r\n\r\n<p>The investor of the building is UNI VIRIDAS dooZagreb<\/p>\r\n\r\n\r\n\r\n<p>The company SOKOL doo Vinkovci was the first to begin construction work on the plant and, depending on the type of work, will be present until the very end.<\/p>\r\n\r\n\r\n\r\n<p>A recapitulation of the work carried out by the company SOKOL doo Vinkovci is as follows;<\/p>\r\n\r\n\r\n\r\n<p>Preparatory work for the introduction into the business and the organization of a container settlement in which all construction participants are accommodated<br \/>Earthworks that include all types of excavation, filling, compaction and landscaping at the very end of construction<br \/>Reinforcement and carpentry work in the construction of all monolithic buildings and plateaus (wheel scale, pouring structure, foundations, reinforced concrete slabs, manholes)<br \/>Sewage system of the complete plant and all usable areas with the installation of a prefabricated separator.<br \/>Water supply and hydrant network<br \/>All types of electrical works from power supply with 35kV water to complete distribution on the construction site and buildings<br \/>Demanding concrete works with special concretes<br \/>Preparation and construction of roads for heavy traffic with arranged pedestrian paths and all necessary equipment<br \/>Construction of the hot water pipeline route<\/p>","protected":false},"featured_media":332,"template":"","meta":{"_acf_changed":true,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0},"vrsta-projekta":[13],"class_list":["post-535","projekti","type-projekti","status-publish","has-post-thumbnail","hentry","vrsta-projekta-niskogradnja-i-visokogradnja"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/sokol-vinkovci.hr\/en\/wp-json\/wp\/v2\/projekti\/535","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sokol-vinkovci.hr\/en\/wp-json\/wp\/v2\/projekti"}],"about":[{"href":"https:\/\/sokol-vinkovci.hr\/en\/wp-json\/wp\/v2\/types\/projekti"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sokol-vinkovci.hr\/en\/wp-json\/wp\/v2\/media\/332"}],"wp:attachment":[{"href":"https:\/\/sokol-vinkovci.hr\/en\/wp-json\/wp\/v2\/media?parent=535"}],"wp:term":[{"taxonomy":"vrsta-projekta","embeddable":true,"href":"https:\/\/sokol-vinkovci.hr\/en\/wp-json\/wp\/v2\/vrsta-projekta?post=535"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}